Bathroom Renovation · Marina Square · Abu Dhabi
Bathroom Renovation in Marina Square, Abu Dhabi.
Buildsmith® delivers bathroom renovation across Marina Square under one fixed-price design-and-build contract. with full documentation pack ready for audit. Abu Dhabi Municipality liaison approval and ADM (Abu Dhabi Municipality) permits managed within scope.
About Marina Square
Marina Square sits at the heart of the apartment-renovation market in Abu Dhabi.
Sub-Clusters / Districts
Marina Square Tower A · Marina Square Tower B · Marina Square Plaza · Marina Square Residence
Typical Unit Layouts
Studio · 1-BR · 2-BR · 3-BR Penthouse
Notable
- ▸Marina Square is a residential community in Abu Dhabi
- ▸Apartment-tower district with multiple Owner Associations across separate buildings
- ▸Renovations governed by tower-specific OAM rulebooks
Site Conditions
Why Marina Square is different for bathroom renovation
Bathroom renovation in Marina Square is a waterproofing question first and a finishes question second — every claim against a building OAM in the UAE traces back to a leak that crossed two ceilings before anyone noticed. We deliver across Marina Square Tower A, Marina Square Tower B, Marina Square Plaza, Marina Square Residence and the broader Marina Square stock with two-coat liquid-membrane systems (Mapei, Sika, BASF), 24-hour flood test before tiling, niche-board membrane wrap and the OAM-recognised waterproofing-warranty certificate at handover. Sanitaryware specifications run from Villeroy & Boch and Hansgrohe through Kohler, Gessi, Duravit and Catalano — picked to the bathroom typology and the building's rule book, not to a generic spec.
Single Contract
How a Marina Square bathroom renovation contract runs
Substrate work is non-negotiable on every Buildsmith® bathroom in Marina Square: floor falls corrected to a minimum 1:80 gradient, drains P-trapped and vented to the riser, niches wrapped in membrane and gypsum partitions backed with cementitious board on the wet face. The 24-hour flood test happens before tiling — not after the building floods downstairs. Brassware lines are pressure-tested at first-fix, sanitaryware is dry-fitted before silicone, and the OAM-recognised waterproofing-warranty certificate is filed in your handover pack alongside the 12-month workmanship warranty — required for resale, insurance and any future apartment-block claim.
Common Requests
What Marina Square clients commission most often.
Three approval-pathway specifics matter most here: these four scopes account for the majority of bathroom renovation work we deliver in Marina Square.
Niche carpentry with membrane-wrapped Wedi board
Stone-clad feature wall with matching vanity top
Bath-to-walk-in-shower conversion with frameless enclosure
Two-coat Mapei / Sika / BASF liquid membrane waterproofing
Approvals Pathway
The Marina Square route — community to authority to completion.
We take care of all approvals and completion certificates.
Marina Square Rules
Constraints we always plan for in Marina Square.
ADM (Abu Dhabi Municipality) permit for any modification
Community management or building-association NOC required
Working hours 08:00–17:00 weekdays
Material delivery via approved service entrances only
What's Included
Every bathroom renovation contract in Marina Square covers:
- Complete demolition & waste removal
- Substrate inspection & repair
- Fall correction & re-screeding
- Two-coat liquid waterproofing (membrane + flood test)
- Stack & branch plumbing rework
- Drain repositioning where needed
- Wall niche framing & carpentry
- Large-format porcelain or natural-stone tiling
- Stone slab walls & vanity tops
- Bespoke vanity joinery in waterproof carcass
- LED-mirror specification & install
- Decorative tile detailing (mosaic / herringbone)
- Sanitaryware supply & install (luxury European brands)
- Concealed-cistern & wall-hung WC fitting
- Walk-in shower with frameless glass
- Brassware install & commissioning
- Extractor sizing & install
- Final clean, snag & 12-month warranty
Nearby Communities
Bathroom Renovation coverage across Abu Dhabi.
Common Questions
Frequently asked about bathroom renovation in Marina Square.
What approvals do I need for bathroom renovation in Marina Square?
Your project routes through Abu Dhabi Municipality liaison first for community NOC, then ADM (Abu Dhabi Municipality) for the engineering permit. Buildsmith® handles both — submission, follow-up, inspection close-out and final completion certificate are all standard scope. We do not start work until the community NOC is granted.
Does coverage extend to every cluster of Marina Square?
Yes — we deliver across Marina Square Tower A, Marina Square Tower B, Marina Square Plaza, Marina Square Residence. Each cluster carries its own approval nuances (façade restrictions, working-hour windows, skip-permit rules) — we map these at survey before quotation.
What scope of bathroom renovation do you cover in Marina Square?
Yes — we deliver across the full Marina Square typology spectrum, from Studio through 2/3-BR. Every project is fixed-price under one design-and-build contract, scoped against your specific unit and finish brief. Indicative figures and a sequenced programme are issued within one business day of survey, never against a generic per-square-foot rate.
How do Marina Square regulations shape the build window?
Three constraints we always plan for in Marina Square: ADM (Abu Dhabi Municipality) permit for any modification; Community management or building-association NOC required; Working hours 08:00–17:00 weekdays. We surface these at the quotation stage so the programme reflects them — not at week three when they suddenly stop site work.
Do Marina Square bathrooms require a community waterproofing certificate?
Yes — Abu Dhabi Municipality liaison typically requires a waterproofing warranty certificate at handover for any bathroom renovation. We deliver two-coat liquid membrane (Mapei / Sika / BASF), 24-hour flood test before tiling, niche-board membrane wrap, and the OAM-recognised waterproofing warranty certificate as standard.
How long does a bathroom renovation take?
A standard master bathroom in an apartment runs 4–6 weeks from strip-out to handover, including waterproofing membrane cure-and-test time. A villa master bathroom with niche tiling and full stone runs 6–10 weeks. We don't rush waterproofing.
Why is waterproofing so important?
Failure of a bathroom waterproofing membrane means leakage into the slab below. In apartments, that means damage to the unit beneath you and a major OA claim. We use two-coat liquid membrane systems (typically Mapei, Sika or BASF) and flood-test every bathroom before tiling — a step many contractors skip.
Can you replace the bath with a walk-in shower?
Yes — this is one of our most common requests for both apartments and villas. We re-screed for fall, reposition drainage, install a linear or point drain and frameless glass enclosure. The shower becomes the focal point of the bathroom.
Renovating a Marina Square property?
Send the address and indicative scope. Within one business day we'll respond with a written scope, the Abu Dhabi Municipality liaison approval pathway specific to Marina Square, and a fixed-price quotation under one accountable design-and-build contract.
Get in Touch
Brief us on your Marina Square project.
Send the brief. Within one business day we issue a written scope, sequenced programme and the Marina Square-specific authority pathway.
Open Mon–Sat · 09:00–19:00