nursery fit out Dubai — Buildsmith®

Commercial · Kids Nursery Fit-Out · KHDA / DM / MOE Compliant · Safety First

Nursery Design & Fit-Out in Dubai — KHDA / ADEK / SPEA Compliant, EN-Certified.

From Mirdif and Al Barsha standalone nurseries to Dubai Hills, Arabian Ranches, Tilal Al Ghaf, Damac Hills, Mudon community nurseries and DIFC / Business Bay corporate-tenant nurseries — Buildsmith® delivers complete kids nursery design and fit-out under one fixed-price contract. Safety-first engineering, 3rd-party inspections assistance, DM, KHDA and MOE guidelines compliance built into the scope. EYFS / Reggio Emilia / Montessori-aligned classrooms, soft-element padding, age-graded furniture and learning resources delivered alongside the build. We take care of all approvals and completion certificates.

1
Accountable Contractor
KHDA
DM · MOE Compliant
3rd-Party
Inspections Assistance
Safety
First
Authority-Approved
DM DDA DMCC Trakhees EMAAR NAKHEEL DAMAC

About This Service

Kids Nursery Design & Fit-out, delivered properly.

A nursery fit-out is the most demanding educational scope in the UAE. KHDA, ADEK and SPEA each impose detailed requirements on layout, ratios, sanitary provision, sleeping arrangements, kitchen separation, outdoor play area sizing, and finish safety. EN 1729 governs the furniture, EN 1176/1177 governs the play equipment, EN 71 governs the toys, and EN 14749 governs the storage. Most general fit-out contractors are not equipped for this — they hand half the scope to a furniture supplier and the other half to a playground supplier and hope it integrates.

Buildsmith® is a nursery-specialist contractor. We deliver end-to-end design and fit-out — pedagogy-led space planning (Reggio Emilia, Montessori, EYFS, IB-PYP-aligned), authority approvals, child-safe MEP, low-VOC finishes, EN 1729-certified furniture, EN 1176/1177-tested play equipment for indoor and outdoor areas, custom storage and joinery, and full handover to authority inspection.

Our nursery work spans private nurseries, school early-years sections, mall nursery operators and premium chain nurseries across Dubai, Abu Dhabi, Sharjah and the Northern Emirates. Every project starts with the regulatory framework (which authority? which standards? which inspection regime?) and works backwards into the design — so the nursery passes inspection on first try, not after rectification.

Deep Dive

Everything you need to know about kids nursery design & fit-out in Dubai.

Nursery Fit-Out Cost in Dubai — KHDA-Compliant Budget

A nursery fit out Dubai budget for a KHDA-licensed nursery typically runs AED 250–500 per sqft for a 4,000–8,000 sqft facility. The budget divides across six scopes: structural and MEP build-out (25%), EN 1729-certified furniture (18%), EN 1176/1177 indoor play equipment (12%), outdoor play and shade (12%), joinery and feature walls (15%), and authority-approval/design coordination (18%). A premium nursery operator targeting the top 5% of the market — with bespoke reading nooks, sensory walls, STEM labs and branded colour ranges — reaches AED 600–800 per sqft.

Authority fees and KHDA licensing sit outside the fit-out budget. We sequence every cost commitment to authority approval status, so you never buy furniture that later has to be replaced to pass inspection.

KHDA, ADEK & SPEA — Three Authorities, One Compliance Framework

A nursery in Dubai operates under KHDA (Knowledge and Human Development Authority). In Abu Dhabi the regulator is ADEK (Department of Education and Knowledge). In Sharjah it's SPEA (Sharjah Private Education Authority). All three regulate similar categories — child-to-staff ratios, floor areas per age group, sanitary provision, sleeping rooms, indoor and outdoor play area sizing, kitchen separation, and finish safety — but with different numeric thresholds and different inspection regimes.

We pre-submit drawings to the relevant authority before procurement, flag any layout issues for the operator to resolve, and track the project through pre-approval, mid-construction inspection, and final inspection. Every KHDA/ADEK/SPEA approved nursery contractor in the UAE is listed publicly; we're on multiple registers. You don't need to learn the compliance framework — we've learned it.

Reggio Emilia, Montessori, EYFS, IB-PYP — Pedagogy-Led Design

A nursery fit-out that ignores pedagogy is a decorated warehouse. A Reggio Emilia classroom needs a central atelier and natural-light axes; a Montessori classroom needs mixed-age furniture heights and work-trays at child-reach; an EYFS environment needs continuous-provision zones (role-play, mark-making, construction, sand/water); an IB-PYP classroom needs inquiry-driven display walls and flexible grouping furniture. These are not aesthetic choices — they are operational requirements for the curriculum to work.

We design to the pedagogy the nursery actually teaches. Before concept drawings we sit with the academic lead to map curriculum to space. The result is a classroom that teaches better — not just one that photographs better. Most nursery fit-outs get this backwards.

EN 1729 · EN 1176 · EN 1177 · EN 71 — The Safety Stack

Nursery furniture and play equipment are regulated as safety products, not decoration. EN 1729-1 sets ergonomic dimensions for chairs and tables by height range (1 through 6); EN 1729-2 sets stability and edge profiles. EN 1176-1 to -7 govern playground equipment — climbing, swinging, sliding, spring-rocking. EN 1177 measures the impact-attenuation performance of soft surfacing via drop-test (HIC — Head Injury Criterion) and yields a Critical Fall Height rating. EN 71-1/-2/-3 govern toy safety — mechanical, flammability and chemical migration.

Every piece of furniture and play equipment we supply ships with the relevant EN certification attached to handover documentation. KHDA inspectors check these routinely — and uncertified furniture triggers rectification orders. We won't supply what won't certify.

Indicative Pricing

Kids Nursery Design & Fit-out pricing — by scope and specification.

All quotes are fixed-price under one design-and-build contract. The numbers below are indicative starting points — final pricing depends on scope of works, size, materials quality and finish specification. Pricing is by scope, not per-sqft rate.

Boutique / Home-Based Nursery

From AED 250,000

Compact home-based or boutique nursery fit-out — partition walls, soft-element padding, age-graded sanitaryware, EN 1729-aligned furniture, basic outdoor play area, KHDA and DM food-safety approvals.

Best fit for villa-conversion nurseries and small standalone units. Final price scales with classroom count, outdoor scope and learning-resource specification.

Standard Community Nursery

From AED 600,000

Full community nursery fit-out — multi-classroom build, soft-element padding throughout, age-graded WCs and basins, sensory walls, music corner, role-play stations, outdoor play with EN 1176/1177-certified surfacing, full KHDA and DM authority pathway.

Pricing scales upward with multilingual signage, bespoke role-play features, industry-leading outdoor equipment and integrated CCTV / parent-app systems — typical community nurseries land between AED 800K and AED 2M.

Premium / International Nursery

Custom Quotation

Premium international nursery and pre-prep school fit-outs — quoted bespoke after KHDA / MOE policy review and curriculum-aligned design brief.

Authority pathway includes MOE alignment for pre-school programs, international curriculum bodies (IB-PYP, EYFS), and 3rd-party safety / hygiene inspection coordination. Indicative budgets typically start at AED 2M and exceed AED 6M.

All starting prices exclude FF&E (loose furniture), authority fees and tenant improvement deposits. We pass through authority fees at cost — never marked up. Pricing depends on scope of works, size, materials quality and finish specification — never on a generic per-sqft rate.

Indicative Timeline

From sign-off to opening day — a four-phase program.

Once design is finalized and the contract is signed, here's how a typical commercial project runs. Real timelines depend on scope and authority workload — this is the ladder we use to set expectations.

Phase 1

OAM / Community / Landlord Approvals

2 – 3 weeks

Submission to building landlord, OAM, mall management or community office — Emaar (ECM), Nakheel (NCM/DCM), Damac CM, Majid Al Futtaim, DMCC building management. Drawings, contractor docs and insurance prepared by us.

Phase 2

Authority Approvals

2 – 3 weeks

DM, DDA, DMCC or Trakhees building modification permits, DEWA reload approvals, DCD fire-safety sign-off. Add 2 – 4 weeks for structural modifications, mezzanine BUA updates or MEP capacity upgrades.

Phase 3

Build / Fit-Out

4 – 8 weeks

Strip-out, partitioning, MEP rough-in, ceilings, flooring, joinery, finishes, AV, IT cabling, signage, FF&E install — under weekly progress reporting with named project manager.

Phase 4

Snagging & Handover

Up to 2 weeks

Joint snagging walk, deficiency closure, DCD inspection, DEWA energisation, completion certificate issuance, operational walk-through. We don't hand over until all approvals + completion certificates are issued.

Indicative timelines — actual program depends on scope, structural complexity, OAM / landlord speed and authority workload. We commit to a written program at sign-off and report against it weekly.

Approvals Pathway

Every kids nursery design & fit-out goes through the same four phases.

We take care of all approvals and completion certificates — submission, follow-up, inspection close-out and final sign-off. The sequence below is universal — what changes is the OAM / community / landlord office and the authority body.

Step 1

OAM / Community Approval

Step 2

Authority Approval

Step 3

Final Inspection

Step 4

Completion Certificate

Master Developer
Community / Landlord Office
Authority
Sign-off
Emaar
Burj Khalifa District · Downtown · Dubai Hills · Emaar Square · The Address · Boulevard Towers · Dubai Mall
ECM
Emaar Community Management
DM / DDA
Completion
Nakheel
Palm Jumeirah · Ibn Battuta · Dragon Mart · Discovery Gardens · Al Furjan
NCM / DCM
Nakheel Community Management
Trakhees
Completion
Damac
Damac Towers · Aykon City · Damac Hills · Reva · Privé
Damac CM
DDA
Completion
DMCC
JLT towers · DMCC trade-licensed offices · Almas Tower · JLT cluster
DMCC Authority
DMCC / DDA
Completion
Victory Heights
Victory Heights — Dubai Sports City
SOAMS
DDA
Completion

Authority approval scope depends on scope of works and level of modification. We assess this at survey — before quotation — so you know exactly what's required before you commit.

Authority & Compliance

Approvals, standards and certifications built into every kids nursery design & fit-out.

Every project is engineered to pass first-time inspection. We take care of all approvals and completion certificates.

DMCC trade-license-linked fit-out approval (JLT, Almas Tower, JLT cluster)
Dubai Municipality (DM) Building Department permits
Dubai Development Authority (DDA) — TECOM, Sports City, Internet City, Media City, JLT
Trakhees — Palm Jumeirah, Ibn Battuta, Discovery Gardens
Dubai Civil Defence (DCD) fire & life-safety sign-off
DEWA — electrical reload, water and chiller integration approvals
Master-developer NOCs (Emaar, Nakheel, Damac, Meraas, Aldar, MAF)
JAFZA, DAFZA, Dubai South free-zone authority approvals
DM food-safety hygiene approvals (F&B fit-out)
KHDA / DHA / MOE approvals (nursery / clinic / school fit-out)
BUA (Built-Up Area) updates with DM / DDA / Trakhees
Tas-heel / DED tenant-improvement permits
Building / mall management NOCs
BS EN structural codes where alterations apply

Completion certificates issued at handover — required for trade-license activation, insurance binding, opening-day go-live and any future audit.

Single Contract

One signature. 360° accountability — design, build, certify, open.

Most commercial projects fail on the seams between vendors. Buildsmith® eliminates the seams. From the first survey to the completion certificate at handover, every line of your project is owned, executed and answered for under one contract — by one team — with one accountable contractor.

End-to-End Delivery

Architectural design, MEP engineering, structural alterations, partitioning, ceiling, flooring, joinery, finishes, AV, IT cabling, signage, FF&E and authority approvals — all delivered by Buildsmith®, none subcontracted to vendors you've never met.

360° Accountability

One named project manager. One fixed-price contract. One program. One snag list. One warranty document. One opening date. If anything fails — workmanship, finish, schedule, compliance, completion certificate — there is exactly one person to call.

All Approvals + Completion Certificates

DM, DDA, DMCC, Trakhees, DCD, DEWA, master-developer NOCs, free-zone authority, food-safety, FCC, KHDA / DHA / MOE — sequenced from day one and closed out with completion certificates at handover.

What's Included

Every kids nursery design & fit-out contract covers:

Design & Approvals
  • Pedagogy-led space planning (Reggio, Montessori, EYFS, IB-PYP)
  • KHDA / ADEK / SPEA pre-approval drawings
  • Layout planning to authority ratios & floor areas
  • Indoor & outdoor play area design
  • Sleeping room & sanitary planning
  • Kitchen / food-prep separation design
Build & Finishes
  • Soft-impact flooring (EN 1177 HIC tested)
  • Low-VOC paints & adhesives
  • Child-safe rounded edges throughout
  • Sanitary fit (child-height WCs, basins, urinals)
  • AC & ventilation balancing
  • Joinery — cubbies, storage, display walls
Furniture & Play
  • EN 1729-certified classroom furniture
  • EN 1176/1177-certified indoor & outdoor play equipment
  • Soft elements (mats, padding, soft play)
  • Modular play & sensory zones
  • Custom-built reading nooks & feature joinery
  • KHDA / ADEK final inspection & opening support

Kids nursery fit-out contractor in Dubai — safety first, KHDA / DM / MOE compliant.

Buildsmith® delivers kids nursery design & fit-out across Dubai as a single accountable design-and-build undertaking. Keyword scope: kids nursery fit-out, nursery design Dubai, EYFS-compliant classroom, Montessori nursery build, KHDA-licensed nursery, MOE pre-school fit-out, 3rd-party safety inspection. Every project is permitted, programd and protected for the operating environment it sits inside — with all approvals and completion certificates handled inside our scope.

All approvals + completion certificates — handled, not handed off

The biggest reason commercial projects in Dubai miss their opening date is mis-sequenced authority approvals. Buildsmith® takes care of all approvals and completion certificates from day one: DM Building Department, DDA for TECOM / Sports City / JLT / Internet City / Media City, DMCC trade-license-linked fit-out, Trakhees for Nakheel commercial properties, DCD fire and life-safety, DEWA reload, master-developer NOCs (Emaar, Nakheel, Damac, MAF, Aldar, Meraas), free-zone bodies (JAFZA, DAFZA, Dubai South), DM food-safety, FCC, KHDA / DHA / MOE, Tas-heel / DED tenant-improvement permits and trade-license activation. Completion certificates issue at handover.

Pricing — by scope of works, not per-sqft rate

Commercial pricing depends on scope of works, materials quality, finish specification and MEP complexity — never on a generic per-sqft rate. We quote line-by-line on every project so you can see exactly where the cost is.

Soft-element padding, EN 1729 furniture, outdoor play surfacing — every safety standard built into the contract.

For kids nursery design & fit-out, opening-day delivery is the contract — not a target. Buildsmith® programs backwards from your trade-license activation, fit-out completion certificate, store-opening or operational go-live date, absorbs DM / DDA / DMCC / DCD / DEWA inspection lead-times into the schedule, and commits to a written handover program at sign-off. Where the situation requires it, we deploy parallel trade teams inside extended out-of-hours windows and close the project on date — without compromising the snag list or the inspection sign-off.

Where we work — every Dubai business district

Coverage across DIFC, Downtown Dubai, Business Bay, Sheikh Zayed Road, DMCC / JLT, Dubai Internet City, Dubai Media City, Dubai Knowledge Park, Dubai Studio City, Dubai Production City, Dubai Outsource City, Dubai Design District (d3), Dubai Healthcare City (DHCC), Dubai Silicon Oasis (DSO), JAFZA, DAFZA, Dubai South, Dubai Investment Park (DIP), Al Quoz, Al Barsha, Deira, Al Karama, Bur Dubai and the wider Dubai commercial map.

Selected Works

Recent kids nursery design & fit-out projects.

Common Questions

Frequently asked about kids nursery design & fit-out in Dubai.

Which authority approvals do nurseries need in the UAE?

Depending on the Emirate: KHDA (Dubai), ADEK (Abu Dhabi), SPEA (Sharjah). All three require approved drawings, child-to-staff ratio compliance, sanitary provision, sleeping rooms, indoor/outdoor play areas, kitchen separation, MEP safety and finish certification. We pre-submit drawings before procurement so the layout is signed off in principle before money is spent.

What standards apply to nursery furniture and play equipment?

EN 1729-1/-2 for school furniture (height ranges, stability, edge profiles). EN 1176/1177 for playground equipment and impact-attenuation surfacing. EN 71-1/-2/-3 for toys. EN 14749 for storage. We supply only certified product and provide certificates with handover documentation.

Do you do indoor and outdoor play areas?

Yes — both. Indoor play includes soft play, modular climbing, sensory zones, role-play villages and reading nooks. Outdoor play includes climbing structures, slides, swings, sand pits, water-play, shaded pergolas, soft-impact rubber surfacing — all to EN 1176/1177 with HIC (Head Injury Criterion) certification.

Can you supply European brand furniture?

Yes — we hold partnerships with leading European nursery furniture manufacturers (German, Italian, Polish and Scandinavian) and supply CE-marked, EN-certified product. We also manufacture custom pieces in our own workshop to the same standards.

How long does a nursery fit-out take?

A typical 5,000–8,000 sqft nursery runs 14–20 weeks from sign-off to opening, with authority approvals sequenced upfront. We programme backwards from your target opening date — typically aligned with the academic-year start.

What are the KHDA nursery requirements in Dubai?

KHDA mandates: minimum classroom area per child (2.5–3.5 sqm depending on age band), age-graded sanitaryware (10–25cm WC heights), EN 1729-compliant furniture, EN 1176/1177-certified outdoor play, child-protection-compliant CCTV with 7-day retention, sleep-room separation from active learning, food-safety-compliant kitchen if meals on-site.

What pedagogy methods does Buildsmith® design for in nursery fit-outs?

Reggio Emilia (atelier zones, mirror walls, documentation displays, natural light maximisation), Montessori (clear floor circulation, height-graded shelving, work-mat zones), EYFS (seven areas of learning structured into legible zones), and IB-PYP (inquiry-based learning corners with research displays).

What is the difference between KHDA, ADEK and SPEA?

KHDA regulates Dubai nurseries and schools; ADEK (Abu Dhabi) and SPEA (Sharjah) regulate the same in their respective emirates. Each authority has its own pre-approval drawing requirements, inspection cadence and licensing pathway. Buildsmith® holds approved-supplier status across all three.

What are EN 1729, EN 1176, EN 1177 standards?

EN 1729 covers educational furniture (height ranges by age band, stability, edge profile). EN 1176 covers playground equipment (entrapment, fall-height, maintenance). EN 1177 covers impact-attenuating surfacing (Critical Fall Height with HIC drop-test). Every Buildsmith® nursery ships with these certifications in the handover pack.

Do you handle DM, DDA, DMCC, Trakhees and DCD approvals?

Yes — we take care of all approvals and completion certificates as standard scope. Submission, follow-up, inspection close-out and final sign-off all sit inside our scope.

Are you approved by Emaar, Nakheel and Damac?

Yes — Buildsmith® holds active vendor relationships with Emaar Community Management (ECM), Nakheel Community Management (NCM/DCM), Damac Community Management, plus DMCC Authority, MAF (Majid Al Futtaim) for malls, and SOAMS for Victory Heights.

Can you work to a tight opening date?

Yes — particularly important where opening is tied to lease commencement, mall handover or trade-license activation. We program backwards from your target date and absorb authority approval timelines into the schedule.

How is pricing structured?

Pricing depends on scope of works, materials quality and finish specification — never on a generic per-sqft rate. We quote line-by-line on every project so you can see exactly where the cost is.

What warranty do you provide?

12 months on workmanship as standard, plus pass-through of all manufacturer warranties on supplied components. Optional annual maintenance contracts extend cover.

Related Commercial Services

Often paired with kids nursery design & fit-out.

Why Buildsmith®

Kids Nursery Design & Fit-out, signed once, opened on date.

When you commission Buildsmith® for kids nursery fit-out, you engage a vertically-integrated design-and-build contractor that owns the entire scope — from KHDA / DM / MOE policy review through safety-first design, EN 1176/1177-certified soft-elements, age-graded furniture, 3rd-party inspection coordination, and the completion certificate that activates your nursery license on opening day.

  • Safety first — anti-trap doors, anti-tip furniture, soft-padded corners, fall-protected surfaces
  • 3rd-party inspections assistance — hygiene, fire, child-protection, structural pre-checks
  • DM, KHDA and MOE guidelines compliance built into design and execution
  • EN 1176/1177 soft-play surfacing · EN 1729 age-graded furniture · EN 71 toy safety
  • Curriculum-aligned design — EYFS, Reggio Emilia, Montessori, IB-PYP, UAE National
  • Multilingual (English / Arabic) signage and labeling
  • Soft-element supply alongside the build — wall padding, corner protectors, sensory walls
  • Outdoor play area engineering with HIC-certified surfacing
  • CCTV, parent-app integration, access control and key-fob systems
  • On-date license-activation commitment — written into the contract
  • 12-month workmanship warranty + manufacturer pass-through

Talk to a Specialist

Send the brief. We'll respond.

A written scope, indicative timeline and approval pathway within one business day.

Coverage

Kids Nursery Design & Fit-out across every Dubai business district.

A single mobilisation team services every commercial address in Dubai — free zones, mainland, mall retail, F&B precincts, warehouse parks and head-office towers.

Financial & Corporate

DIFC · Downtown · Business Bay · Sheikh Zayed Road · Trade Center · One Central · Emaar Square · Burj Khalifa District

Free Zones

DMCC · JLT · DAFZA · JAFZA · Dubai South · DIC · DMC · DKP · DSC · DPC · DOC · DHCC · DSO · DIP

Retail & F&B

Dubai Mall · Mall of the Emirates · Dubai Hills Mall · City Walk · La Mer · The Beach JBR · Bluewaters · Box Park · Alserkal Avenue

Creative & Design

Dubai Design District (d3) · Alserkal Avenue · City Walk · Al Quoz · Pearl Jumeirah

Industrial & Logistics

JAFZA · DAFZA · Dubai South · DIP · Al Quoz Industrial · Ras Al Khor · Dubai Industrial City · Al Aweer

Mainland & Mixed-Use

Deira · Bur Dubai · Al Karama · Al Barsha · Al Quoz · Jumeirah · Mirdif · Al Wasl · Festival City · Mirdif City Center

Opening a kids nursery in Dubai?

Send the location, the classroom count, the curriculum (EYFS / Montessori / Reggio / IB-PYP) and the licensing target date. Within one business day, we'll come back with a written scope, the KHDA / DM / MOE authority-approval pathway, 3rd-party inspection coordination, soft-element and furniture brief, and a fixed-price quotation — engineered safety-first, opening-day ready.

Send Brief WhatsApp Call Us

Get in Touch

Send us your kids nursery design & fit-out brief.

A written scope and indicative timeline within one business day.

Phone
+971 58 934 3408
WhatsApp
+971 58 934 3408
Email
info@buildsmith.ae
Office
Dubai, United Arab Emirates
Open Mon–Sat · 09:00–19:00
Project type, location, scope, indicative timeline...

Service Areas

Kids Nursery Design & Fit-out — delivered across the UAE.

Buildsmith® delivers kids nursery design & fit-out as a single mobilisation team — same contract, same standards, same project-management discipline. Pick your community to see the authority pathway and community-specific approval rules.

Dubai

Kids Nursery Design & Fit-out in Palm Jumeirah Kids Nursery Design & Fit-out in Emirates Hills Kids Nursery Design & Fit-out in Arabian Ranches Kids Nursery Design & Fit-out in Tilal Al Ghaf Kids Nursery Design & Fit-out in Dubai Hills Estate Kids Nursery Design & Fit-out in Al Barari Kids Nursery Design & Fit-out in Mudon Kids Nursery Design & Fit-out in Damac Hills Kids Nursery Design & Fit-out in Damac Hills 2 Kids Nursery Design & Fit-out in Jumeirah Golf Estates Kids Nursery Design & Fit-out in The Villa Dubailand Kids Nursery Design & Fit-out in MBR City Kids Nursery Design & Fit-out in Jumeirah Park Kids Nursery Design & Fit-out in Jumeirah Islands Kids Nursery Design & Fit-out in The Springs Kids Nursery Design & Fit-out in The Meadows Kids Nursery Design & Fit-out in The Lakes Kids Nursery Design & Fit-out in Al Furjan Kids Nursery Design & Fit-out in Town Square Kids Nursery Design & Fit-out in Mira Kids Nursery Design & Fit-out in Reem Kids Nursery Design & Fit-out in Akoya Kids Nursery Design & Fit-out in Mirdif Kids Nursery Design & Fit-out in Discovery Gardens Kids Nursery Design & Fit-out in Victory Heights Kids Nursery Design & Fit-out in Al Sufouh Kids Nursery Design & Fit-out in Pearl Jumeirah Kids Nursery Design & Fit-out in Umm Suqeim Kids Nursery Design & Fit-out in Al Wasl Kids Nursery Design & Fit-out in Jumeirah Kids Nursery Design & Fit-out in Dubai Marina Kids Nursery Design & Fit-out in Downtown Dubai Kids Nursery Design & Fit-out in Business Bay Kids Nursery Design & Fit-out in DIFC Kids Nursery Design & Fit-out in JBR Kids Nursery Design & Fit-out in Bluewaters Kids Nursery Design & Fit-out in Palm Jumeirah Residences Kids Nursery Design & Fit-out in JVC Kids Nursery Design & Fit-out in JLT Kids Nursery Design & Fit-out in Dubai Internet City Kids Nursery Design & Fit-out in City Walk Kids Nursery Design & Fit-out in La Mer Kids Nursery Design & Fit-out in Dubai Silicon Oasis Kids Nursery Design & Fit-out in Dubai Sports City Kids Nursery Design & Fit-out in Motor City Kids Nursery Design & Fit-out in Dubai Studio City Kids Nursery Design & Fit-out in Dubai Production City Kids Nursery Design & Fit-out in MBR City Apartments Kids Nursery Design & Fit-out in DMCC Kids Nursery Design & Fit-out in Sheikh Zayed Road Kids Nursery Design & Fit-out in Dubai Media City Kids Nursery Design & Fit-out in Dubai Knowledge Park Kids Nursery Design & Fit-out in Dubai Design District Kids Nursery Design & Fit-out in Dubai Healthcare City Kids Nursery Design & Fit-out in JAFZA Kids Nursery Design & Fit-out in DAFZA Kids Nursery Design & Fit-out in Dubai South Kids Nursery Design & Fit-out in Dubai Investment Park Kids Nursery Design & Fit-out in Al Quoz

Abu Dhabi

Kids Nursery Design & Fit-out in Saadiyat Island Kids Nursery Design & Fit-out in Yas Island Kids Nursery Design & Fit-out in Yas Acres Kids Nursery Design & Fit-out in West Yas Kids Nursery Design & Fit-out in Al Reef Kids Nursery Design & Fit-out in Al Ghadeer Kids Nursery Design & Fit-out in Al Raha Gardens Kids Nursery Design & Fit-out in Khalifa City Kids Nursery Design & Fit-out in Mohammed Bin Zayed City Kids Nursery Design & Fit-out in Hidd Al Saadiyat Kids Nursery Design & Fit-out in Mamsha Al Saadiyat Kids Nursery Design & Fit-out in Mayan Kids Nursery Design & Fit-out in Noya Kids Nursery Design & Fit-out in Al Reem Island Kids Nursery Design & Fit-out in Al Raha Beach Kids Nursery Design & Fit-out in Marina Square Kids Nursery Design & Fit-out in Corniche Kids Nursery Design & Fit-out in Al Bateen Kids Nursery Design & Fit-out in Al Khalidiya Kids Nursery Design & Fit-out in Al Mushrif Kids Nursery Design & Fit-out in Al Karamah Kids Nursery Design & Fit-out in Al Manhal Kids Nursery Design & Fit-out in Gate Towers Kids Nursery Design & Fit-out in Sun Tower Kids Nursery Design & Fit-out in Sky Tower Kids Nursery Design & Fit-out in Al Maryah Island Kids Nursery Design & Fit-out in Capital Centre Kids Nursery Design & Fit-out in Mussafah Industrial Kids Nursery Design & Fit-out in KIZAD Kids Nursery Design & Fit-out in Masdar City Kids Nursery Design & Fit-out in twofour54 Kids Nursery Design & Fit-out in Al Bateen Executive Park

Sharjah

Kids Nursery Design & Fit-out in Al Majaz Kids Nursery Design & Fit-out in Al Khan Kids Nursery Design & Fit-out in Aljada Kids Nursery Design & Fit-out in Tilal City Kids Nursery Design & Fit-out in Al Rahmaniyah Kids Nursery Design & Fit-out in University City Kids Nursery Design & Fit-out in Al Nahda Kids Nursery Design & Fit-out in Muweilah

Ajman

Kids Nursery Design & Fit-out in Al Nuaimia Kids Nursery Design & Fit-out in Al Rashidiya Kids Nursery Design & Fit-out in Al Mowaihat Kids Nursery Design & Fit-out in Al Hamidiya Kids Nursery Design & Fit-out in Al Jurf

Ras Al Khaimah

Kids Nursery Design & Fit-out in Al Hamra Kids Nursery Design & Fit-out in Mina Al Arab Kids Nursery Design & Fit-out in Al Marjan Island Kids Nursery Design & Fit-out in Al Nakheel Kids Nursery Design & Fit-out in RAK FTZ

Umm Al Quwain

Kids Nursery Design & Fit-out in Al Salamah Kids Nursery Design & Fit-out in Al Maidan Kids Nursery Design & Fit-out in Al Ras Kids Nursery Design & Fit-out in Al Khor

Fujairah

Kids Nursery Design & Fit-out in Sakamkam Kids Nursery Design & Fit-out in Al Faseel Kids Nursery Design & Fit-out in Mirbah Kids Nursery Design & Fit-out in Dibba Kids Nursery Design & Fit-out in Masafi