apartment renovation Dubai — Buildsmith®

Residential · OA-Compliant Design & Build · Single Contract

Apartment Renovation in Dubai — OA-Compliant Design and Build.

From Marina Promenade studios and JBR 1-BRs to Downtown penthouses and Palm Residences duplexes — Buildsmith® delivers full apartment renovation under one fixed-price design-and-build contract. OA NOCs, DM/DDA partition permits, DEWA reload approvals, Trakhees envelope sign-off and Civil Defence smoke-detector clearances — all sequenced from day one, all handled within scope.

1
Accountable Contractor
20K+
Studio Starting Budget (AED)
4–8
Weeks Renovation Window
12mo
Workmanship Warranty
Authority-Approved
DM DDA OAM DEWA Trakhees

Why This Matters

The standard apartment renovation process is broken.

Industry StandardWhat apartment owners usually live through

  • Contractor underestimates Owner Association rules — works get stopped mid-strip-out
  • Lift bookings missed, delivery rejected, program slips by weeks
  • Plumbing rerouted without OAM NOC — leak penalties + insurance void
  • Variation orders pile up — final invoice double the original quote
  • Snagging is negotiated after move-in, not built into the schedule

The Buildsmith® WayHow we deliver instead

  • Building survey first — OAM rulebook, working hours, lift slots, security pass policy
  • Specifications locked at sign-off — no silent substitutions
  • OAM, DM/DDA, Trakhees, DEWA and DCD pathway sequenced from day one
  • Fixed-price contract — variations only billed when scope changes are agreed in writing
  • Snagging is scheduled, not argued — included in the original program

About This Service

Apartment renovation, delivered properly.

Apartment renovation in Dubai and Abu Dhabi is governed by a stack of constraints that don't apply to villa work — Owner Association working hours, service-lift bookings, common-area protection, water-tightness compliance for floors above occupied units, and noise-level commitments. Most renovation horror stories start where the contractor underestimates these. We don't.

Buildsmith® delivers complete apartment renovations across Dubai Marina, Downtown, Business Bay, Palm Jumeirah Residences, JBR, Emirates Living, Bluewaters, Al Reem Island, Saadiyat and the wider UAE. Scope includes full kitchen and bathroom renovation, bedroom and master-suite reworks, living-room and dining joinery, full flooring replacement, ceiling and lighting redesign, smart-home integration and complete interior painting.

Every project starts with a building survey and an OA familiarisation: working hours, lift access, waste removal protocol, security clearance, water-shut-off coordination and structural restrictions. We deliver a single fixed-price contract that includes OA NOCs, DEWA approvals where service modifications are needed, and full snagging — so you sign once and walk back into a finished home.

Deep Dive

Everything you need to know about apartment renovation in Dubai.

Apartment Renovation Cost in Dubai — Budget by Typology

The apartment renovation Dubai cost question has a simple structure: what's the size, what's the scope, and which building? A full apartment renovation in a Dubai Marina tower — where you're touching kitchen, two bathrooms, joinery, flooring and painting — typically runs AED 120,000 to AED 280,000 for a 1,200 to 1,800 sqft flat. A penthouse in Downtown or Palm Jumeirah Residences with stone finishes, custom joinery walls and smart-home integration can exceed AED 600,000. A Business Bay investor-flip rework usually sits at the AED 80–150 per sqft end of the range.

Every fixed-price quote we issue itemises strip-out, MEP, flooring, joinery, sanitaryware, lighting and FF&E separately — so if you want to understand what's driving a cost difference between two buildings, the arithmetic is visible.

Owner Association NOCs — The Rule Most Contractors Ignore

Every Dubai tower has an Owner Association (or Building Management Committee) with its own fit-out rules: approved working hours (usually 09:00–17:00 weekdays in residential towers), lift booking, contractor registration, security deposits, waste-disposal scheduling, noise compliance, and water-shut-off coordination. Skipping these rules is how renovation projects get stopped by building security at 08:00 on a Monday morning.

Our project managers handle the full OA NOC package as part of scope — contractor registration with the OA office, working-hours permit, lift booking for materials ingress, security clearance for trades, and pre-notification of affected neighbours. You sign once. We manage the building.

Marina · Downtown · JBR · Business Bay · Palm Residences — Building-Specific Rules

A Dubai Marina apartment renovation in Cayan Tower, Princess Tower or Marina Promenade operates under Emaar Community Management rules. A Downtown Dubai apartment renovation in The Address, BLVD Heights or Opera Grand runs through Emaar Downtown. A JBR apartment renovation sits under Dubai Properties. A Business Bay apartment renovation at Paramount Tower, Damac Paramount or Executive Towers goes through separate DAMAC / Dubai Properties rules. A Palm Jumeirah Residences rework at Oceana, Shoreline, Tiara or the W sits under Trakhees-PCFC plus Nakheel.

We hold approved-contractor status across multiple of these developers — which means your renovation can begin 2–3 weeks sooner than if you engaged a contractor who has to apply for registration from scratch.

Occupied-Building Renovation — Discretion Is Part of the Scope

Your neighbours didn't sign up for your renovation. That's the unspoken constraint on every apartment renovation Dubai project — and the biggest reason clients switch contractors mid-project. Noise outside approved hours, dust in corridors, lift damage, or a trade team lingering in the lobby are all reasons an OA can shut your project down for a week.

Our occupied-building protocol covers all of it: dust-tight door seals, corridor floor protection, vacuum sanders, pre-notified neighbours, trades dressed and briefed, waste removed daily, and a site cleaned to hotel standard at 17:00 every working day. Your renovation should be invisible to everyone except you and the designer.

Indicative Pricing

Apartment renovation pricing — by typology.

All quotes are fixed-price under one design-and-build contract. The numbers below are indicative starting points — final pricing depends on scope, specification, OAM building rules and authority pathway. Owner Association NOCs are included as standard.

Studio

From AED 20,000

Starting budget for a studio renovation — paint, vanity refresh, lighting reset, flooring spot-replacement.

Final price scales with kitchen replacement, full bathroom rebuild, smart-home integration and engineered timber or stone flooring. Studios in Marina, JLT, JVC, Business Bay and JBR typically scale from AED 20K to AED 120K+ for full transformations.

1-BR Apartment

From AED 40,000

Starting budget for a 1-BR renovation — wall paneling, crown molding, painted finishes, ceiling cove and feature lighting.

Pricing scales upward with kitchen and bathroom rebuilds, full flooring replacement, partition modifications, walk-in wardrobe joinery, and smart-home integration — typical full 1-BR renovations land between AED 80K and AED 350K.

2-BR / 3-BR / Penthouse

Custom Quotation

2-BR, 3-BR, duplex and penthouse renovations are quoted bespoke after building survey and OAM rule-book review.

Authority pathway lengthens with internal partition modifications and DM/DDA permits. Indicative budgets typically start at AED 200K and exceed AED 2M for full penthouse rebuilds in Downtown, Palm Residences, Bluewaters and Marina.

All starting prices exclude furniture, white goods, art, building OAM service charges, and authority fees paid to DM/DDA/Trakhees/DEWA/DCD. We pass through authority fees at cost — never marked up.

Indicative Timeline

From sign-off to handover — a four-phase program.

Once design is finalized and the contract is signed, here's how a typical apartment renovation runs. Real timelines depend on scope and the building's OAM workload — this is the ladder we use to set expectations.

Phase 1

OAM / Community Approvals

2 – 3 weeks

Submission to your Owner Association Manager (OAM) or community management — Emaar (ECM), Nakheel (NCM/DCM), Damac CM or SOAMS. We prepare drawings, contractor docs, insurance certificates and security passes on your behalf.

Phase 2

Authority Approvals

2 – 3 weeks

DM, DDA or Trakhees building modification permits, DEWA reload approvals, DCD smoke-detector layout sign-off where required. Add 2 – 4 weeks for structural alterations or major partition rework where engineering review is needed.

Phase 3

Renovation

4 – 8 weeks

Strip-out, partition rebuild, MEP rework, kitchen, bathroom, joinery, flooring, finishes and smart-home integration — executed inside OAM working-hour windows with weekly progress reporting. Heavy structural scope extends this phase.

Phase 4

Snagging & Handover

Up to 2 weeks

Joint snagging walk, deficiency closure, final cleaning, OAM completion sign-off and full documentation pack. We don't hand over until the punch list is closed and the building inspector has cleared the unit.

These are indicative timelines — actual program depends on scope, structural complexity, OAM speed, lift-booking availability and authority workload. We commit to a written program at design sign-off and report against it weekly.

Approvals Pathway

Every apartment renovation goes through the same four phases.

The sequence below is universal — what changes is the OAM rulebook, the community management office and the authority body. We map the pathway to your building before we even quote.

Step 1

OAM / Community Approval

Step 2

Authority Approval

Step 3

Final Inspection

Step 4

Completion

Master Developer
OAM / Community Office
Authority
Sign-off
Emaar
Burj Khalifa · Burj Vista · The Address Residences · BLVD Heights · Vida Residences · Boulevard Point · 8 Boulevard Walk
ECM
Emaar Community Management
DDA
Completion
Nakheel
Palm Tower · Shoreline Apartments · Tiara Residences · Marina Residences · Al Sufouh · Discovery Gardens · Al Furjan
NCM / DCM
Nakheel Community Management
Trakhees
Completion
Damac
Damac Towers by Paramount · Aykon City · Damac Heights · Reva Residences · Bay's Edge · Privé by Damac
Damac CM
Damac Community Management
DDA
Completion
Victory Heights
Victory Heights — Dubai Sports City
SOAMS
Sports Owners Association
DDA
Completion

Authority approval scope depends on the level of modification: cosmetic refurbishments may only need OAM sign-off, while internal partition relocation, full kitchen rebuilds with stack changes, and ceiling smoke-detector reconfigurations trigger DM/DDA/Trakhees engineering review with DCD fire-safety sign-off. We assess this at survey — before quotation — so you know exactly what's required before you commit.

Building-Specific Rules

Marina · Downtown · JBR · Business Bay · Palm Residences — every tower has its own rulebook.

Iconic Dubai apartment buildings — Marina Promenade, Marina Heights, Princess Tower, Cayan Tower, Le Reve, 23 Marina, Marina Crown, Manchester Tower, Shams, Sadaf, Murjan, Bahar, Rimal in JBR; Burj Khalifa, The Address Downtown, Burj Vista, BLVD Heights, Boulevard Point, Burj Royale, Vida Residences in Downtown; Damac Towers, Executive Towers, Bay Square, Bayz, Reva Residences in Business Bay; Palm Tower, Shoreline Apartments, Tiara Residences, Marina Residences, FIVE Palm Jumeirah on Palm Residences; Bluewaters Residences on Bluewaters Island — each operates under a unique OAM rulebook with its own working hours, lift-booking system, contractor security policy, water-shut-off protocol and waste-disposal route. Buildsmith® holds active vendor relationships across the most-trafficked towers and submits the building-specific NOC pack at survey, not after contract sign-off — eliminating the most common reason apartment renovations slip.

Single Contract

One signature. 360° accountability — design, build, snag, warrant.

Most apartment renovations fail on the seams between vendors — designer hands to contractor, contractor argues with OAM, OAM blocks the lift, kitchen vendor delivers two weeks late. Buildsmith® eliminates the seams. From the first survey to the twelfth-month warranty visit, every line of your scope is owned, executed and answered for under one contract — by one team — with one accountable contractor.

End-to-End Delivery

Architectural design, MEP engineering, joinery manufacture, partition rebuild, kitchen, bathroom, glazing, finishes, smart-home and painting — all delivered by Buildsmith®, none subcontracted to vendors you've never met.

360° Accountability

One named project manager. One fixed-price contract. One program. One snag list. One warranty document. If anything fails — workmanship, finish, schedule — there is exactly one person to call, and we already know who.

OAM + Authority Pathway

OAM rulebooks, ECM, NCM, DCM, SOAMS, DM, DDA, Trakhees, DEWA and DCD — sequenced from day one. We submit, follow up, attend inspections, manage lift bookings and close certifications under our own scope, not yours.

What's Included

Every apartment renovation contract covers:

Strip-Out & Build
  • OA-coordinated strip-out & waste removal
  • Internal partition modifications
  • Floor screed & substrate preparation
  • Engineered timber, porcelain or stone flooring
  • Ceiling drop, cove & lighting recess works
  • Door replacement (timber-veneer, glazed, pocket)
Kitchen, Bath & Joinery
  • Full kitchen demolition & rebuild
  • Custom-made or German-modular kitchens
  • Master-suite & guest bathroom renovation
  • Walk-in wardrobes & built-in storage
  • TV walls, console units & display joinery
  • Veneer, lacquer & stone-clad finishes
MEP, Smart & Painting
  • DEWA-certified rewire & switchgear
  • Plumbing reroute (within building constraints)
  • AC service & FCU upgrade
  • Smart-home integration (lighting, blinds, climate)
  • Low-VOC interior painting throughout
  • Snagging, defect liability & 12-month warranty

Apartment renovation in Dubai — OA-compliant, fixed-price, signed off by one team.

Buildsmith® delivers apartment renovation in Dubai as a single accountable design-and-build undertaking — engineered around the constraint that apartment buildings keep operating while you renovate. From Dubai Marina high-rises (Marina Promenade, Princess Tower, Cayan, 23 Marina, Le Reve, Marina Heights) and JBR beachfront towers (Shams, Sadaf, Murjan, Bahar, Rimal) to Downtown Dubai landmarks (Burj Khalifa, The Address, Burj Vista, BLVD Heights, Boulevard Point), Business Bay towers (Damac Towers, Executive Towers, Bay Square, Reva), Palm Jumeirah Residences (Palm Tower, Shoreline, Tiara, Marina Residences, FIVE Palm), Bluewaters Residences, Emirates Living, JLT, JVC, DIFC and Al Reem Island — every apartment we renovate is permitted, programd and protected for the building it sits inside. Our scope routinely covers kitchen renovation, bathroom renovation, full flooring replacement (engineered timber, marble, porcelain), partition modifications, walk-in wardrobes, smart-home integration, ceiling redesign and villa renovation for duplex and penthouse units.

Owner Association NOCs — included as standard, not an add-on

Every apartment renovation Buildsmith® delivers includes the full Owner Association (OA) NOC pack as part of the contract — not as an extra line item, not as the client's responsibility. That covers the contractor registration, security passes, lift-booking schedule, working-hour permit, water-shut-off coordination, common-area protection plan, waste-disposal routing and insurance certificate submission. Each tower has its own OAM rulebook — Marina Promenade is not Burj Khalifa, JBR is not Business Bay — and we hold active vendor relationships across the most-trafficked Dubai towers so the NOC pack lands fast.

Studio, 1-BR, 2-BR, penthouse — same delivery model, different envelope

Studio renovations start for paint-and-vanity refreshes andfor full transformations with kitchen rebuild and engineered flooring. 1-BR renovations start for cosmetic upgrades — wall paneling, crown molding, painted finishes, ceiling cove, feature lighting — andfor structural modifications, full kitchen and bathroom rebuilds, partition reworks and smart-home integration. 2-BR, 3-BR, duplex and penthouse renovations are quoted bespoke after building survey, with budgets typically starting at and exceeding for full penthouse rebuilds.

Authority pathway — DM, DDA, OAM, DEWA and Trakhees, sequenced from day one

The five bodies you'll meet during a Dubai apartment renovation are your Owner Association Manager (OAM), Dubai Municipality (DM), Dubai Development Authority (DDA) for areas like JLT, TECOM and Sports City, Trakhees for Palm Jumeirah, Discovery Gardens and other Nakheel developments, DEWA for electrical and water modifications, and where ceiling smoke-detector layouts change, Dubai Civil Defence (DCD). Buildsmith® holds approved-vendor relationships across these bodies and submits, follows up, attends inspections and closes certifications under our own scope. Authority and OA fees are passed through at cost, with documentation included in your handover pack — required for resale, insurance and tenancy renewal.

Kitchen, bathroom, joinery, flooring — every scope under one apartment renovation program.

An apartment renovation is rarely a single trade. It's a kitchen rebuild, two or three bathroom renovations, full flooring replacement, joinery for living, dining, bedrooms and walk-in wardrobes, ceiling redesign, lighting reconfiguration, smart-home integration and complete repainting — running in parallel under one program, inside an OAM working-hour window, with lift bookings and security passes coordinated daily. Buildsmith® delivers all of it from a single design-and-build contract with a single named project manager. No "we don't do that — you'll need another contractor". No silent value-engineering substitutions. No invoice creep.

Building-friendly construction — quiet, dust-controlled, neighbour-safe

Apartment renovation is the only construction trade where the customer beside you, above you and below you matters. We strip out with negative-air dust extraction, sequence demolition into approved hours, protect lift cars and corridors with double-skin floor and wall protection, deliver materials only inside booked windows, and pre-notify neighbours through the OAM office. Heavy demolition is sequenced upfront — finishing trades work quieter — and we close out each working day with the corridors swept, the lift returned to service and the unit secured.

Smart-home, lighting and AV — integrated at design, not retrofit

Lighting circuits, climate zones, motorised blinds, security cameras, intercoms, audio zones and home automation are designed into the MEP package — not bolted on after handover. Buildsmith® specs Lutron, Crestron, Loxone, KNX or Control4 systems based on your scenario, programs the dashboard with your scenes, and trains your household at handover. The whole package routes through DEWA-certified electrical and is documented in the as-built pack — which the building's facilities team will keep on file for life.

Tenant move-in deadlines, off-plan handover snagging — programd backwards

Apartment renovations frequently sit against fixed move-in dates — a tenant taking handover, an owner returning from abroad, an off-plan unit needing snagging-and-finish before legal handover. We program backwards from the date, absorb building constraints into the schedule, and commit to a written handover program at sign-off. Where the situation requires it, we deploy parallel trade teams inside extended OAM hours and close the project on date — without compromising the snag list.

Selected Works

Recent apartment renovation projects.

Common Questions

Frequently asked about apartment renovation in Dubai.

What approvals do I need for apartment renovation in Dubai?

Three layers: (1) building Owner Association (OA) NOC with renovation deposit, (2) DM building-modification permit if MEP, walls or façade are touched, (3) DEWA reload approval where electrical capacity changes. Buildsmith® holds approved-vendor relationships with most Dubai OAs (Emaar, Nakheel, Damac, Aldar, Sobha) for faster turnaround.

What is the apartment renovation timeline Dubai?

Studios run 4–6 weeks, 1-BR 6–8 weeks, 2–3-BR 8–12 weeks, penthouses 12–20 weeks — assuming OA NOC turnaround of 2–3 weeks. Working-hour restrictions in occupied buildings (typically 09:00–17:00 weekdays) are factored into the programme.

Can apartment renovation happen with the building occupied?

Yes — Buildsmith® specialises in occupied-building delivery. Dust-containment screens, lift-padding, after-hours noise compliance, freight-lift booking and neighbour pre-notification are all under our scope. Most clients keep using kitchen, bathroom and bedrooms while non-active rooms are renovated.

How much does an apartment renovation cost in Dubai?

Studio renovations start for cosmetic refreshes. 1-BR renovations start for basic wall paneling, molding and painted finishes — and scale through for full kitchen and bathroom rebuilds, flooring replacement, partition modifications and smart-home integration. 2-BR, 3-BR and penthouse units are quoted bespoke. All Buildsmith® quotes are fixed-price under a single design-and-build contract with Owner Association NOCs included.

How long does a typical apartment renovation take?

Once design is finalized: 2 – 3 weeks for OAM and community approvals, 2 – 3 weeks for authority approvals (DM, DDA or Trakhees), 4 – 8 weeks for the renovation itself, and up to 2 weeks for snagging and handover. Structural modifications and major partition reworks extend the authority phase by a further 2 – 4 weeks. We commit to a written program at sign-off and report against it weekly.

Which approvals do I need for an apartment renovation?

The standard pathway is: OAM/community approval first (Emaar ECM, Nakheel NCM/DCM, Damac CM or SOAMS for Victory Heights), then authority approval (DM/DDA for most communities, Trakhees for Palm Jumeirah and other Nakheel developments), then DEWA reload approvals where electrical capacity changes, then Dubai Civil Defence (DCD) sign-off where ceiling smoke-detector layouts are reconfigured. Buildsmith® handles all of it under our scope — Owner Association NOCs are included as standard, not an add-on.

Will my neighbours be disturbed?

We work strictly within OAM-approved hours (typically 09:00–17:00 weekdays in Dubai, varies by building). Heavy demolition is sequenced upfront with negative-air dust extraction; finishing trades work quieter. We pre-notify neighbours through the OAM office and protect lifts and corridors with double-skin floor and wall protection. End of every working day: corridors swept, lift returned to service, unit secured.

Can you remove or relocate walls in my apartment?

Some walls — yes, with structural-engineer sign-off and a DM/DDA permit. Load-bearing walls and shear walls cannot be removed. We assess this on the first site survey, propose options that respect the building's structure, and submit drawings for authority approval before any demolition starts.

Do you handle Owner Association paperwork?

Yes — OA NOCs, contractor registration, security passes, working-hour permits, lift bookings, waste-disposal scheduling and insurance certificate submissions are all handled by our project manager. You sign once. Owner Association NOCs are included as standard scope across every Buildsmith® apartment renovation contract.

Do you cover Marina, Downtown, JBR, Business Bay and Palm Residences?

Yes — those are core delivery areas. We hold active vendor relationships across Marina Promenade, Princess Tower, Cayan, 23 Marina, Le Reve, Marina Heights, Shams, Sadaf, Murjan, Bahar, Rimal (JBR), Burj Khalifa, The Address, Burj Vista, BLVD Heights, Boulevard Point (Downtown), Damac Towers, Executive Towers, Bay Square, Reva (Business Bay), Palm Tower, Shoreline, Tiara Residences, Marina Residences, FIVE Palm Jumeirah, plus Bluewaters, Emirates Living, JLT, JVC, DIFC and Al Reem Island — same contract, same standards, same accountability across every building.

Can you work to a tight handover date?

Yes — particularly for tenants moving in, off-plan handovers requiring snag-and-finish, or owners returning from abroad. We program backwards from your move-in date, absorb building constraints into the schedule, and commit to a written handover program at sign-off. Where required, we deploy parallel trade teams inside extended OAM hours to close the project on date.

What does a single design-and-build contract include?

One contract covers: architectural and interior design, MEP engineering, OAM and authority submissions, in-house joinery manufacture, on-site execution, kitchen, bathroom, flooring, finishes, glazing, smart-home integration, snagging and a 12-month workmanship warranty. Owner Association NOCs are included as standard. The only items not included are furniture, white goods, art, and authority/OA fees — passed through at cost and never marked up.

What warranty do you provide on an apartment renovation?

Twelve months on workmanship as standard, plus pass-through of all manufacturer warranties on supplied components — typically 5 – 10 years on glazing systems, 2 – 5 years on AC and FCU, 2 years on appliances and 5 years on bathroom waterproofing. Optional annual maintenance contracts extend cover and include scheduled preventative servicing.

Related Residential Services

Often paired with apartment renovation.

Why Buildsmith®

Apartment renovation, without disturbing the building.

When you commission Buildsmith® for apartment renovation, you get a fully integrated design-and-build team that owns the entire scope — from the OAM rulebook walkthrough through to the final snag list — under one fixed-price contract. No subcontractor handovers. No vendor pingpong. No silent substitutions. No surprises with the building.

  • One named project manager from sign-off to twelve-month warranty visit
  • Fixed-price design-and-build contract — variations only with written sign-off
  • OAM + authority pathway managed end-to-end (OAM, ECM, NCM, DCM, SOAMS, DM, DDA, Trakhees, DEWA, DCD)
  • Owner Association NOCs included as standard — not an add-on
  • Active vendor relationships across Marina, Downtown, JBR, Business Bay, Palm Residences
  • In-house joinery, MEP, partition and finishes teams — no chain of subcontractors
  • Negative-air dust extraction, lift and corridor protection, neighbour pre-notification
  • Weekly progress reporting — dashboards, photos, schedule-vs-actual
  • Snagging scheduled, not argued — included in the original program
  • 12-month workmanship warranty + pass-through manufacturer warranties

Talk to a Specialist

Send the brief. We'll respond.

A written scope, indicative timeline and OAM-approval pathway for your apartment within one business day.

Coverage

Apartment renovation across the UAE.

A single mobilisation team services any address in either emirate — same contract, same standards, same accountability.

Dubai Communities

Dubai Marina · Downtown · Business Bay · DIFC · JBR · Bluewaters · Palm Jumeirah Residences · JVC · JLT · Emirates Living · Dubai Hills Estate · MBR City · City Walk · La Mer · Pearl Jumeirah · Al Wasl · Umm Suqeim · Jumeirah · Al Sufouh · Al Quoz · Dubai Internet City · Dubai Silicon Oasis · Discovery Gardens · Al Furjan · Town Square · Reem · Akoya · Mudon · Mirdif · Damac Hills · Tilal Al Ghaf · Al Barari · Arabian Ranches · Emirates Hills · Dubai Hills · Jumeirah Golf Estates · Jumeirah Park · Jumeirah Islands · Springs · Meadows · Victory Heights

Abu Dhabi Communities

Saadiyat Island · Yas Island · Al Reem Island · Al Raha Beach · Al Raha Gardens · Khalifa City · Mohammed Bin Zayed City · Al Reef · Al Ghadeer · Al Bandar · Al Zeina · Al Muneera · Hidd Al Saadiyat · Mamsha Al Saadiyat · Soul Al Saadiyat · Yas Acres · West Yas · Mayan · Ansam · Lea · Noya · The Bridges · Park View · Marina Bay · Marina Square · Al Reem Bay · Sun Tower · Sky Tower · Gate Towers · Corniche · Al Bateen · Al Khalidiya · Al Mushrif · Al Karamah · Al Manhal · Al Mariah · Khalifa Park

Renovating an apartment in Dubai?

Send the building, the unit and the scope you have in mind. Within one business day, we'll come back with a written scope, the OAM and authority-approval pathway specific to your tower, and a fixed-price quotation under one accountable design-and-build contract — covering studios from 1-BRs from and larger units on bespoke quotation. Owner Association NOCs included as standard.

Send Brief WhatsApp Call Us

Get in Touch

Send us your apartment renovation brief.

A written scope and indicative timeline within one business day.

Phone
+971 58 934 3408
WhatsApp
+971 58 934 3408
Email
info@buildsmith.ae
Office
Dubai, United Arab Emirates
Open Mon–Sat · 09:00–19:00
Project type, location, scope, indicative timeline...

Service Areas

Apartment Renovation — delivered across the UAE.

Buildsmith® delivers apartment renovation as a single mobilisation team — same contract, same standards, same project-management discipline. Pick your community to see the authority pathway and community-specific approval rules.

Dubai

Apartment Renovation in Dubai Marina Apartment Renovation in Downtown Dubai Apartment Renovation in Business Bay Apartment Renovation in DIFC Apartment Renovation in JBR Apartment Renovation in Bluewaters Apartment Renovation in Palm Jumeirah Residences Apartment Renovation in JVC Apartment Renovation in JLT Apartment Renovation in Dubai Internet City Apartment Renovation in City Walk Apartment Renovation in La Mer Apartment Renovation in Dubai Silicon Oasis Apartment Renovation in Dubai Sports City Apartment Renovation in Motor City Apartment Renovation in Dubai Studio City Apartment Renovation in Dubai Production City Apartment Renovation in MBR City Apartments

Abu Dhabi

Apartment Renovation in Al Reem Island Apartment Renovation in Al Raha Beach Apartment Renovation in Marina Square Apartment Renovation in Corniche Apartment Renovation in Al Bateen Apartment Renovation in Al Khalidiya Apartment Renovation in Al Mushrif Apartment Renovation in Al Karamah Apartment Renovation in Al Manhal Apartment Renovation in Gate Towers Apartment Renovation in Sun Tower Apartment Renovation in Sky Tower